Grant scheme Scaling up fully renewable hydrogen production via electrolysis (OWE)

Item date:

26 July 2024

Category of item:

Financieringsmogelijkheden

Number of likes:

Number of reactions:

0 reacties

Number of views:

93x viewed

Electrolyser

Grant scheme Scaling up fully renewable hydrogen production via electrolysis (OWE)

Do you want to produce renewable (sustainable) hydrogen with an electrolyser? And does this electrolyser have a capacity of 0.5 to a maximum of 50 megawatts? Then apply for a subsidy with the subsidy scheme Scaling up fully renewable hydrogen production via electrolysis (OWE).

New application round in 2024

.

After the summer, a 2nd round of applications for the PRA will open. A number of things are changing in the scheme. We have already listed the changes for you. On September 5 and 6 we will organize a webinar about the new application round. We will explain the application process, and give useful tips to make your application a success.

View the changes Subscribe to webinar

For whom?

This subsidy is for companies that realize and use a hydrogen production installation for the production of renewable hydrogen. You will be using an electrolyser with a capacity of 0.5 to a maximum of 50 megawatts.

You will only receive a subsidy if you also produce hydrogen with your hydrogen production installation.

What do you get a subsidy for?

You will receive a subsidy for the investment costs of your production installation (investment part). And for the production of hydrogen with this installation for a minimum of 7 and a maximum of 15 years (operating part). With the model 'Investment budget and feasibility study' you can calculate your subsidy amount for the investment and exploitation part. You can find this model on the page Applications under the drop-down menu 'Substantiate the feasibility of your project'.

h2
more info & conditions

Open for applications